Default Spaulding turnpike work

Am I the only one who thinks that the spaulding turnpike re-work (expanding from single lane to two lanes exit 12 to 16) is taking a loooooong time ? Stimulas money/infrastructure money being a bit abused here??

This is their third year and I believe it is going to take at least another 1-2 years ?? r u kidding ?

They built the entire Hoover dam in that amount of time.
Ridgefarmer63 is offline   Reply With Quote
Old 10-02-2011, 10:11 AM   #2
Sal
Senior Member
 
Sal's Avatar
 
Join Date: Apr 2004
Location: Moultonborough
Posts: 311
Thanks: 103
Thanked 169 Times in 53 Posts
Default A few more workers ?

re: Hoover Dam

"Once construction began, Six Companies (the construction company) hired large numbers of workers, with more than 3,000 on the payroll by 1932 and with employment peaking at 5,251 in July 1934."
Sal is offline   Reply With Quote
Old 10-02-2011, 10:19 AM   #3
Ridgefarmer63
Member
 
Join Date: Feb 2011
Location: New Durham, NH
Posts: 39
Thanks: 23
Thanked 3 Times in 3 Posts
Default

Totally understand Sal. but,.... 6 miles of already existing road verses carving out one of the most impressive feats in the history of Man from a in-hospitable mountain of stone ???

Oh yeah, we have some better modern equipment now, ya think ??
Ridgefarmer63 is offline   Reply With Quote
Old 10-02-2011, 12:08 PM   #4
tis
Senior Member
 
tis's Avatar
 
Join Date: Jan 2006
Posts: 6,386
Thanks: 716
Thanked 1,375 Times in 951 Posts
Default

That is so funny you mention that. We went there yesterday and said the same thing!!!! But I know nothing about road work and how long it should take. It just seems like that job has taken forever.
tis is offline   Reply With Quote
Old 10-02-2011, 02:29 PM   #5
jeffatsquam
Senior Member
 
Join Date: Oct 2009
Location: moultonborough/sandwich
Posts: 186
Thanks: 173
Thanked 77 Times in 50 Posts
Default

Happen to know one of the Principles of the firm doing the major part of the work and I asked him the same thing.

What he said was that the state specified the time line and that they maned the job accordingly.

Knowing something about the company they have 5 to 10 times the equipment and man power and could have done it in half the time if that's what the contract specified.
jeffatsquam is offline   Reply With Quote
The Following 3 Users Say Thank You to jeffatsquam For This Useful Post:
bclaker (10-04-2011), Ridgefarmer63 (10-04-2011), tis (10-02-2011)
Sponsored Links
Old 10-02-2011, 03:33 PM   #6
tis
Senior Member
 
tis's Avatar
 
Join Date: Jan 2006
Posts: 6,386
Thanks: 716
Thanked 1,375 Times in 951 Posts
Default

Quote:
Originally Posted by jeffatsquam View Post
Happen to know one of the Principles of the firm doing the major part of the work and I asked him the same thing.

What he said was that the state specified the time line and that they maned the job accordingly.

Knowing something about the company they have 5 to 10 times the equipment and man power and could have done it in half the time if that's what the contract specified.
That's VERY interesting. I wonder why the state would want the job to take a long time???? Do they like to prolong the agony for the driving public????
tis is offline   Reply With Quote
Old 10-02-2011, 08:44 PM   #7
Merrymeeting
Senior Member
 
Merrymeeting's Avatar
 
Join Date: Mar 2003
Location: Merrymeeting Lake, New Durham
Posts: 2,216
Thanks: 299
Thanked 795 Times in 365 Posts
Default

On a similar note, we came home via Rt 3 today. The new toll booths in Merrimack were re-constructed at about the same time as the ones in Hampton. Does anyone know why they decided to NOT implement full speed EZPass lanes here like the ones in Hampton?

There seems to be plenty of room and it would have made sense to do while they were rebuilding.
Merrymeeting is offline   Reply With Quote
The Following User Says Thank You to Merrymeeting For This Useful Post:
Rattlesnake Guy (10-03-2011)
Old 10-03-2011, 06:38 AM   #8
Belmont Resident
Senior Member
 
Belmont Resident's Avatar
 
Join Date: Apr 2004
Location: Belmont NH but prefer Jackman Maine
Posts: 1,857
Thanks: 491
Thanked 409 Times in 251 Posts
Default test run

From what I understand the Hampton tolls were a test run to see if they worked before adding new ones.
I’ve heard that the Hooksett tolls are next.
Maybe after that they will get rid of the useless Bedford tolls and move them to Nashua.
Belmont Resident is offline   Reply With Quote
Old 10-03-2011, 12:15 PM   #9
Merrymeeting
Senior Member
 
Merrymeeting's Avatar
 
Join Date: Mar 2003
Location: Merrymeeting Lake, New Durham
Posts: 2,216
Thanks: 299
Thanked 795 Times in 365 Posts
Default

Quote:
Originally Posted by Belmont Resident View Post
From what I understand the Hampton tolls were a test run to see if they worked before adding new ones.
I’ve heard that the Hooksett tolls are next.
Maybe after that they will get rid of the useless Bedford tolls and move them to Nashua.
That's kind of my point. If they were thinking they might change it in the future, why did they just finish redoing it?
Merrymeeting is offline   Reply With Quote
Old 10-03-2011, 05:37 PM   #10
Belmont Resident
Senior Member
 
Belmont Resident's Avatar
 
Join Date: Apr 2004
Location: Belmont NH but prefer Jackman Maine
Posts: 1,857
Thanks: 491
Thanked 409 Times in 251 Posts
Default because

That would make sense, and we all know that state workers never or hardly ever do things that make sense. I believe they call it job security. Makes no sense to me
Belmont Resident is offline   Reply With Quote
Old 10-04-2011, 10:33 AM   #11
mcdude
Senior Member
 
mcdude's Avatar
 
Join Date: Jul 2002
Location: Rock Haven Lake - West Newfield, ME
Posts: 5,359
Thanks: 374
Thanked 1,041 Times in 489 Posts
Default

click for; SPAULDING TURNPIKE TRAFIC CAMS

Quote:
WIDENING THROUGH ROCHESTER: In February 2008, the NHDOT began a $177 million project to widen 5.2 miles of the Spaulding Turnpike from EXIT 12 (NH 125) north to EXIT 16 (US 202 / NH 11). The work will widen the original two-lane "super-2" design to a full four-lane, dual-carriageway freeway shared by the rest of the turnpike to the south. Several bridges also will be built, including the bridge over NH 125 at EXIT 12 that has been flagged for replacement since 1992 because of structural deficiencies. The project is slated for completion in late 2012, approximately six years behind the original schedule.

THE TURNPIKE TODAY: According to the NHDOT, the Spaulding Turnpike carries 15,000 vehicles per day (AADT) along its two-lane northerly stretches to as many as 75,000 vehicles per day near the southern terminus in Portsmouth. The turnpike, which has been designated NH 16 along its entire length since 1991, joined the EZ-Pass system in 2005 when readers were added to the Dover and Rochester mainline toll plazas.

WHAT HAPPENED TO EXIT 10? The "missing" interchange was set aside for an east-west turnpike that was to extend west to the eastern terminus of I-393 near Concord. The NHDOT purchased right-of-way for the proposed EXIT 10 for $3 million in 1995, but the completion of the NH 101 Expressway likely precluded the need for the proposed link.
Project Specific Information

__________________


Last edited by mcdude; 10-05-2011 at 09:15 AM.
mcdude is offline   Reply With Quote
The Following User Says Thank You to mcdude For This Useful Post:
Ridgefarmer63 (10-05-2011)
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 03:09 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.

This page was generated in 0.63563 seconds