Go Back   Winnipesaukee Forum > Winnipesaukee Forums > Getting Here
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Calendar Register FAQDonate Members List Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 04-04-2022, 01:46 PM   #1
DickR
Senior Member
 
Join Date: Apr 2008
Location: Moultonborough
Posts: 735
Thanks: 4
Thanked 254 Times in 166 Posts
Default Bridge project above Meredith lights

Does anyone know how long the bridge repair project on route 3 above (south) of the lights at Meredith will take? I would hope they plan to finish before the busy season. The wait at the temporary lights for the one open lane has been just a couple of minutes the few times I have gone through, midweek, but, gee, that whole area backs up badly at peak times without road closures.
DickR is offline   Reply With Quote
The Following User Says Thank You to DickR For This Useful Post:
LIforrelaxin (04-04-2022)
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 12:00 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.

This page was generated in 0.17955 seconds