Default Ziggy's by Analee

For weeks the progress has been at a standstill on the chain coffee joint set to open near analee in meredith.

An excavator has been sitting on site for awhile.. piles of material.. partially built structure now dormant.. Anyone know the deal as to why things came to to a halt??
Downeast is offline   Reply With Quote
Old 07-13-2023, 07:05 AM   #2
Biggd
Senior Member
 
Join Date: Nov 2016
Location: Waltham Ma./Meredith NH
Posts: 3,752
Thanks: 1,966
Thanked 1,071 Times in 676 Posts
Default

Quote:
Originally Posted by Downeast View Post
For weeks the progress has been at a standstill on the chain coffee joint set to open near analee in meredith.

An excavator has been sitting on site for awhile.. piles of material.. partially built structure now dormant.. Anyone know the deal as to why things came to to a halt??
The place is just an oversized trailer, don't know why it's taking so long?
Biggd is offline   Reply With Quote
Old 07-13-2023, 04:23 PM   #3
fatlazyless
Senior Member
 
fatlazyless's Avatar
 
Join Date: Apr 2004
Posts: 8,528
Blog Entries: 1
Thanks: 296
Thanked 957 Times in 698 Posts
Default

Nothing happening there at Ziggy's with building construction since maybe March or February? Does it even have a roof to keep the rain out?
__________________
... down and out, liv'n that Walmart side of the lake!
fatlazyless is offline   Reply With Quote
Old 07-13-2023, 11:12 PM   #4
Downeast
Senior Member
 
Join Date: May 2015
Posts: 102
Thanks: 1
Thanked 36 Times in 20 Posts
Default

Quote:
Originally Posted by fatlazyless View Post
Nothing happening there at Ziggy's with building construction since maybe March or February? Does it even have a roof to keep the rain out?
From what I can tell, it has no roof yet. maybe some tarps to protect the structure.

def something's up, that a lot of $$$$ deteriorating. And the fact the excavator is just sitting there not transported to make money elsewhere is strange
Downeast is offline   Reply With Quote
Old 07-27-2023, 12:31 PM   #5
pondguy
Senior Member
 
pondguy's Avatar
 
Join Date: Jan 2009
Posts: 231
Thanks: 543
Thanked 177 Times in 119 Posts
Default

They were doing a road cut for the water line yesterday and it was busy this morning with other thing going on.
pondguy is offline   Reply With Quote
The Following User Says Thank You to pondguy For This Useful Post:
Biggd (07-27-2023)
Sponsored Links
Old 09-13-2023, 01:37 PM   #6
MeredithMan
Senior Member
 
MeredithMan's Avatar
 
Join Date: Aug 2013
Location: Bedford, NH; Meredith, NH
Posts: 864
Thanks: 233
Thanked 768 Times in 302 Posts
Default Still nothing....

....made a point to drive by there earlier today in the hope of trying them out. NOT. Backhoe still sitting there with piles of gravel all around. The structure is nowhere near being finished.
MeredithMan is offline   Reply With Quote
The Following User Says Thank You to MeredithMan For This Useful Post:
GregW11 (09-13-2023)
Old 09-13-2023, 06:55 PM   #7
phoenix
Senior Member
 
phoenix's Avatar
 
Join Date: Apr 2004
Location: phoenix and moultonboro
Posts: 1,520
Thanks: 58
Thanked 266 Times in 187 Posts
Default

Looks like a 2024 opening
__________________
it's tough to make predictions specially about the future
phoenix is online now   Reply With Quote
Old 01-11-2024, 09:50 AM   #8
MeredithMan
Senior Member
 
MeredithMan's Avatar
 
Join Date: Aug 2013
Location: Bedford, NH; Meredith, NH
Posts: 864
Thanks: 233
Thanked 768 Times in 302 Posts
Default Getting close...

...most of the outside is complete...looks like some signage and some lighting remain. Appears to be lots of supplies inside. They even had a "hiring" sign in the parking lot a couple weeks ago.
MeredithMan is offline   Reply With Quote
Old 01-11-2024, 11:48 AM   #9
Biggd
Senior Member
 
Join Date: Nov 2016
Location: Waltham Ma./Meredith NH
Posts: 3,752
Thanks: 1,966
Thanked 1,071 Times in 676 Posts
Thumbs up

Quote:
Originally Posted by MeredithMan View Post
...most of the outside is complete...looks like some signage and some lighting remain. Appears to be lots of supplies inside. They even had a "hiring" sign in the parking lot a couple weeks ago.
I saw a Facebook post saying they were opening January 17th. Looking forward to trying it!
Biggd is offline   Reply With Quote
The Following 2 Users Say Thank You to Biggd For This Useful Post:
coolyourjets (01-27-2024), MeredithMan (01-11-2024)
Old 01-11-2024, 04:03 PM   #10
jeffk
Senior Member
 
jeffk's Avatar
 
Join Date: Feb 2004
Location: Center Harbor
Posts: 1,130
Thanks: 201
Thanked 421 Times in 239 Posts
Default

Sign outside says opening Tuesday.
jeffk is offline   Reply With Quote
The Following 2 Users Say Thank You to jeffk For This Useful Post:
Loub52 (01-11-2024), MeredithMan (01-11-2024)
Old 01-26-2024, 01:24 PM   #11
fatlazyless
Senior Member
 
fatlazyless's Avatar
 
Join Date: Apr 2004
Posts: 8,528
Blog Entries: 1
Thanks: 296
Thanked 957 Times in 698 Posts
Default Ziggy's free 16-oz drink of your choice, Saturday, Jan 27

Ziggi's Coffee just opened up for business on or about January 23, and is promoting a free Ziggy's "16-oz beverage of your choice" on Saturday, January 27th from 10-am to 2-pm.

Suggest that you google Ziggy's Coffee, Meredith NH, in Facebook to verify the authenticity of this message ....... ...... because no one believes anything, anymore! ...... ha-ha-ha ......

Something about that name ZIGGY'S seems like a very good name for a cup of totally excellent coffee, so go have one on me, Saturday, from 10-2!
__________________
... down and out, liv'n that Walmart side of the lake!
fatlazyless is offline   Reply With Quote
The Following User Says Thank You to fatlazyless For This Useful Post:
Rockman33 (01-27-2024)
Old 02-10-2024, 10:29 AM   #12
MeredithMan
Senior Member
 
MeredithMan's Avatar
 
Join Date: Aug 2013
Location: Bedford, NH; Meredith, NH
Posts: 864
Thanks: 233
Thanked 768 Times in 302 Posts
Default Finally tried Ziggy's...

After the months of anticipation, I was really hoping that this would be great new coffee/quick breakfast option. I unfortunately have to say that we are not fans.

I got a large hot coffee. After a few sips, I dumped it out. To my taste buds, the coffee was very "Starbucks-like"...very strong, even though it was the Medium Roast. (I know many folks love their Starbucks, but I'm not one of them).

We also discovered that the food is pre-packaged, so there is no customizing. Example: The menu board showed a Sausage, Egg, & Cheese on an Everything Bagel. My wife wanted Bacon, Egg, & Cheese on an Everything Bagel. When I asked for the Bacon, Egg, & Cheese on an Everything, the Ziggy's person replied that she couldn't do that, as the food is pre-packaged and they heat it up. She did say that we could get a Bacon, Egg, and Cheese on a Plain Bagel, however. We went with that, but it looked like a bagel sandwich out of an airport vending machine. My wife said that it wasn't horrible, but it wasn't particularly good, either.

We may give it another shot in the future to see if other things on the menu are any better, but we won't be in a rush.
MeredithMan is offline   Reply With Quote
Old 02-11-2024, 07:45 AM   #13
SAMIAM
Senior Member
 
Join Date: Apr 2004
Location: Moultonborough
Posts: 2,836
Thanks: 326
Thanked 1,626 Times in 562 Posts
Default

Havent tried the food but like the Chai tea and staff is very nice
SAMIAM is offline   Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 06:07 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.

This page was generated in 0.22369 seconds