Go Back   Winnipesaukee Forum > Winnipesaukee Forums > General Discussion
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Calendar Register FAQDonate Members List Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 05-08-2017, 06:16 AM   #11
BroadHopper
Senior Member
 
BroadHopper's Avatar
 
Join Date: Oct 2004
Location: Laconia NH
Posts: 5,522
Thanks: 3,129
Thanked 1,090 Times in 784 Posts
Default Fencing

Phase I does have a chain linked fence and the reason for that was federal safety rules and regulations as the track is considered active. Phase II has a combination pleasing metal picket fence and wood railing. This is due to changes in regulation result of feedback. I urge you to take a walk on Phase II and enjoy the new fences. Phase II connect to the Belmont Trail that brings you near Mosquito Bridge. I wonderful walk.

Belmont plans will eventually connect to the Tilton trail. From there the possibility of biking/hiking to Concord or Hanover is planned.

There is preliminary planning in Meredith about building a rail trail from downtown Meredith down to the Weirs. This is really exciting!
__________________
Someday may never be an actual day.
BroadHopper is offline   Reply With Quote
The Following User Says Thank You to BroadHopper For This Useful Post:
upthesaukee (05-08-2017)
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 02:24 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.

This page was generated in 2.44618 seconds