Go Back   Winnipesaukee Forum > Winnipesaukee Forums > General Discussion
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQ Members List Donate Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Display Modes
Old 08-14-2020, 11:24 AM   #1
Biggd
Senior Member
 
Join Date: Nov 2016
Location: Waltham Ma./Meredith NH
Posts: 4,427
Thanks: 2,429
Thanked 1,271 Times in 814 Posts
Default

Quote:
Originally Posted by mswlogo View Post
It turns out the new well was put in 100% conforming. They added a 40 foot sleeve which essentially reduces the required set back proportionally depending how deep the sleeve is. All town approved. I thought for sure the assessor didn’t know it was sleeved and would adjust the load capacity back up to the original septic design. They specifically call out the new well as the reason for reduced load capacity. But they would not adjust it. It’s just to much money to risk what some board will approve or not approve some day. Everything was done by the book. I feel bad for the seller. But there are enough uneducated buyers out there that it will probably sell for the same money quickly.
I hope you find something but at this point in the summer I would be patient. Maybe things will slow down when the cold weather hits and you won't have to compete with the summer shoppers.
Biggd is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 07:44 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.

This page was generated in 0.09808 seconds