I'm starting to consider a structural improvement (stabilization) project for my camp on Rattlesnake Island. In exploring my options I want to understand more about barging equipment and materials out to Rattlesnake. In the least I foresee needing a bunch of concrete and likely some crushed stone for drainage improvements.
What if I wanted to get a truckload of concrete to the island? Is there a barge on the lake that can haul a 70k lb load? All I can find is that 30k lbs appears to be the max from https://www.lakelifeservicesnh.com/winni-works-barge What does it cost to get a barge to Rattlesnake from West Alton? Any advice or warnings or perspective on Island construction and materials/equipment transport is much appreciated. Obviously, on an island less is more, but 'something' is still necessary. Thanks. |
07-23-2020, 11:51 AM | #2 |
Senior Member
Join Date: Mar 2008
Location: Welch Island and West Alton
Posts: 3,263
Thanks: 1,203
Thanked 2,035 Times in 934 Posts
|
We often see Island Service Company barges go by Welch with heavy equipment. A few years ago they barged a septic pumping truck over here. I have never seen a cement mix truck on a barge if that is what you are looking for. Most Island cement is mixed on site They do have a large brge:
https://www.islandservicecompany.com/equipment.htm |
07-23-2020, 12:06 PM | #3 |
Senior Member
|
East Coast Foundation in Moultonborough has a mini-mixer cement truck and a small concrete pump on a trailer intended for island work.
__________________
... down and out, liv'n that Walmart side of the lake! |
07-23-2020, 12:17 PM | #4 |
Senior Member
Join Date: May 2004
Posts: 962
Thanks: 495
Thanked 273 Times in 174 Posts
|
Bigger is Better
Island Service Company in Meredith has a huge 40' barge the should be able to do this job. 🐻
|
07-23-2020, 01:40 PM | #5 |
Senior Member
Join Date: Mar 2006
Location: Merrimack and Welch Island
Posts: 4,190
Thanks: 1,275
Thanked 1,568 Times in 1,018 Posts
|
We're currently using Island Construction for major dock repairs (Once every 60 years level, remove concrete docks and replace.) Last year, they did some major structural work on the camp. Very versatile group. They also do open/close, electrical and plumbing. We're pleased with their work. Point is, we looked for somebody to do the types of work we need, rather than looking for a barge. Most companies that do major island projects have their own solutions for different types of work.
Island Construction 209 Stage Rd Sanbornton, NH 03269 US 603-387-4992 Island_construction@icloud.com |
The Following User Says Thank You to Descant For This Useful Post: | ||
Top-Water (07-23-2020) |
Sponsored Links |
|
07-23-2020, 02:50 PM | #6 |
Senior Member
Join Date: Nov 2009
Location: Moultonborough, NH
Posts: 425
Thanks: 17
Thanked 212 Times in 134 Posts
|
Looks like a big truck on this barge. Photo came from the I Boat on Lake Winnipesaukee FB page.
|
07-24-2020, 05:26 AM | #7 | |
Senior Member
Join Date: Jul 2009
Location: Epping, NH / Mark Island
Posts: 1,743
Thanks: 168
Thanked 688 Times in 396 Posts
|
Quote:
Sent from my SAMSUNG-SM-G930A using Winnipesaukee Forum mobile app
__________________
....keeping " urban decay " out of photos for nearly a year. |
|
07-24-2020, 07:25 AM | #8 | |
Senior Member
Join Date: Jan 2006
Posts: 6,567
Thanks: 742
Thanked 1,426 Times in 988 Posts
|
Quote:
|
|
07-24-2020, 09:12 AM | #9 |
Senior Member
|
..... the $3.58 solution.
For $3.58 you can purchase a sturdy 50-lb paper sack of Quikrete high strength concrete mix at Lowe's ........ boat it out to your island on your own boat ...... and get to work.
No need to build concrete forms ....... just position the 50-lb bags into an overlapping formation or wall ...... rip-rap style ...... soak em good with the garden hose ..... and 24-hours later ...... you got concrete set in place to keep everything from rolling down the slope, and into the lake ...... or something. .... :rolleye2 To actually make this work, you need to soak the paper bags till very wet so the water really soaks through the paper, and into the concrete mix. Is not as effective as placing the bags underwater, into the lake, because all the dry concrete does not get totally soaked.
__________________
... down and out, liv'n that Walmart side of the lake! |
07-24-2020, 09:54 AM | #10 |
Senior Member
Join Date: Mar 2006
Location: Merrimack and Welch Island
Posts: 4,190
Thanks: 1,275
Thanked 1,568 Times in 1,018 Posts
|
What kind of "Barge"
Hourly rate alone can be deceptive. Barge work could be to carry heavy equipment, 2-3 kts. an LST at 10 kts or an old pontoon at 15 kts. And (is she still around?) the Kitty Belle, a sidewheeler built for shallow draft and truck drive through ramps, like a ferry.
|
The Following User Says Thank You to Descant For This Useful Post: | ||
ApS (07-30-2020) |
07-24-2020, 11:27 AM | #11 |
Senior Member
Join Date: Jan 2017
Location: Jackson Pond, New Hampton
Posts: 220
Thanks: 39
Thanked 132 Times in 72 Posts
|
That's Watermark Construction shown in Winni83's photo, they're out of Gilford. You might also contact Ambrose Marine in Meredith as they aren't that far away. Jim Bean in Tuftonboro also has a very large steel barge.
Two points to bear in mind, first all of these guys are extremely busy this time of year so you will likely have to book w-a-y ahead. And two, these are extremely heavy rigs and they can't be stopped or turned without going a very long distance, steer clear and always grant them the right of way! |
07-24-2020, 06:53 PM | #12 |
Senior Member
Join Date: Jul 2006
Posts: 577
Thanks: 124
Thanked 247 Times in 133 Posts
|
Kitty Belle is still going strong. I think they had a new bottom put on her last winter or the winter before that. She’s a workhorse.
|
07-25-2020, 03:40 PM | #13 |
Senior Member
Join Date: Jul 2011
Location: Mont Vernon NH & Big Barndoor Island
Posts: 321
Thanks: 4
Thanked 184 Times in 62 Posts
|
When we were looking for a house, I think every house we looked at on the east side of Rattlesnake had bad foundation piers. I saw more than one with bags of cement piled around the piers making things worse. I never priced it, but this has to be a big expense to fix
|
07-30-2020, 06:24 AM | #14 |
Senior Member
Join Date: Mar 2012
Posts: 122
Thanks: 86
Thanked 46 Times in 27 Posts
|
Concrete Delivery
There are several companies out there that produce on demand concrete and have trucks that only begin mixing the ingredients to produce concrete when they reach the job site. Not sure on truck weight or barge capability, but this may be an option. All the big concrete companies offer concrete mixes that involve a retarder of some sort to allow the mix a longer hold time so it doesnt set up before it reaches the job, this is probably a good option for an island. Best days to order a concrete truck for this type of project would be when the weather is cloudy and the temperature is between 55 and 70.
|
07-30-2020, 06:44 AM | #15 | |
Senior Member
Join Date: Sep 2008
Location: Meredith Bay & LI, NY
Posts: 3,220
Thanks: 1,214
Thanked 1,007 Times in 648 Posts
|
Quote:
Sent from my iPhone using Winnipesaukee Forum mobile app |
|
Bookmarks |
Thread Tools | |
Display Modes | |
|
|