![]() |
![]() |
|
|||||||
| Home | Forums | Gallery | Webcams | Blogs | YouTube Channel | Classifieds | Register | FAQ | Members List | Donate | Search | Today's Posts | Mark Forums Read |
|
|
Thread Tools | Display Modes |
|
|
|
|
#1 |
|
Senior Member
Join Date: Apr 2004
Posts: 505
Thanks: 12
Thanked 428 Times in 147 Posts
|
One of the most common questions we get in the process of permitting docking is: "What difference does it make if I have a permament dock instead of a seasonal one?" This especially happens when we tell people they must build seasonal. The subject of this thread is in fact a large part of the resoan that seasonal docks are "default" dock type and anything more requires proof of need.
Chapter Env-Wt 400 which regulates dock construction begis as follows: PART Env-Wt 401 STATEMENT OF PURPOSE AND EVALUATION Env-Wt 401.01 Purpose. The purpose of this chapter is to protect the public trust and other interests of the state of New Hampshire, by: (a) Establishing requirements for the design and construction of structures in order to prevent unreasonable encroachment on surface waters of the State; (emphasis added) (b) Preserving the integrity of the surface waters of the state by requiring all structures to be constructed so as to insure safe navigation, minimize alterations in prevailing currents, minimize the reduction of water area available for public use, avoid impacts that would be deleterious to fish and wildlife habitat, and avoid impacts that might cause erosion to abutting properties; and (emphasis added) (c) Ensuring that all projects are constructed using the least impacting alternatives, in a manner that meets the requirements of RSA 483-B and shoreline and bank alteration or stabilization requirements.Any time a permit is issued for a permanent pier we understand that there is a possiblity and aquatherm will be installed also. (Environmental Services does not regulate the aquatherm; only the dock construction.) Part of the reasoning for installing a season dock is that because it is removed for the winter no aquatherm is needed and there will be less of a "reduction of water area available for public use." |
|
|
| The Following User Says Thank You to Onshore For This Useful Post: | ||
Lakegeezer (01-23-2014) | ||
|
|
#2 | |
|
Senior Member
Join Date: Mar 2003
Location: Merrymeeting Lake, New Durham
Posts: 2,229
Thanks: 305
Thanked 800 Times in 369 Posts
|
Quote:
I know of several cases where aquatherms are being used for "seasonal" dock systems because the owners don't want to bother removing them. Why not start with making sure that seasonally permitted docks are in fact just that? (this is not a question for you shore things. I appreciate your frequent and educational posts. Rhetorical...) |
|
|
|
|
|
#3 | |||
|
Junior Member
Join Date: Apr 2010
Posts: 16
Thanks: 0
Thanked 0 Times in 0 Posts
|
Quote:
I just don't, as an individual, have the legal or regulatory authority for the compliant and safe operation of the aquatherms. That is under the purview of the state governance and enforcement departments. They won't. NH Safety, via MP, came to the lake when there was 600-800' of shore front open 200' out. They took no action. They did tell me I need 3 more signs (4 in total, one in each direct), although the 24/7 abutter had no signage at the time at all and now have 1. NH DES said it would favor an interpretation of 270:33 that "public access thereto" included all waterfront in the winter as the lake level is 20+ feet from the high water mark and should be considered "public" as it is the state's. However, the safety aspect was NH Safety. This was verbal. Quote:
Quote:
I would also recommend small language changes (IN RED ABOVE) to this that would basically make some of these purported impacts during the application process must be maintained thereafter, with revocation of a permanent dock for subsequent non-compliance (obviously, with various levels of warnings). This would provide a 2-prong 2-Department enforcement approach; (1) NH DES dock permit and subsequent operation of ice-retardant systems as per application as a condition of retaining the dock permit) and (2) NH SAFETY under the language changes in the above mentioned RSA. |
|||
|
|
|
|
#4 |
|
Senior Member
Join Date: Mar 2008
Location: Alton
Posts: 166
Thanks: 13
Thanked 19 Times in 8 Posts
|
Growing up in a resort town on the ocean and having lived in two houses on the beach we always had a neighbor who threatened or hassled my folks over land or land use (especially THE PROPERTY LINES). It looks to me like it happens anywhere there's a lot of money involved and it's the stuff that usually makes lawyers rich. One neighbor got what was coming to him when our land was surveyed and it turned out we owned his driveway and part of the back of his house.
I may not represent everybody's views, but if I knew my neighbor was scheming against me and talking about the law, I'd for certain push back. I could think of a thousand other things that would be far more annoying than leaving a bubbler on - for example feeding the geese.
|
|
|
|
|
#5 | |
|
Junior Member
Join Date: Apr 2010
Posts: 16
Thanks: 0
Thanked 0 Times in 0 Posts
|
Quote:
My neighbors aren't like you. They get most of all of the above by email. Very up front. |
|
|
|
| Sponsored Links |
|
|
|
|
#6 |
|
Senior Member
Join Date: May 2004
Posts: 230
Thanks: 21
Thanked 14 Times in 8 Posts
|
Curious how much a 1/2 HP circulator adds to ones electric bill each month. Never had any dock damage without one in the last 51 years. New folks around us have started using circulators, some of them without timers apparently. Lots of birds living around the edge of the open water. One place where snowmobiles and ice fisherman used to get on and off the ice has been open water now for the last 8 years due to circulators.. seems like a monkey see monkey do thing for many of them.
|
|
|
|
|
#7 |
|
Senior Member
Join Date: Apr 2008
Location: Moultonborough
Posts: 767
Thanks: 4
Thanked 261 Times in 173 Posts
|
In crude terms, 1/2 HP is 0.37 KW. If you run it on a timer for say 25% of the time, that's 2.24 KWH per 24 hour period, or 69 KWH in a 31 day month. If your marginal electric rate is 14 cents/KWH, you add just under $10 to the electric bill. If you ran it continuously, you'd pay almost $40 a month, gain nothing in terms of dock protection, and annoy your neighbors who want to get out on the ice in winter.
|
|
|
|
|
#8 | |
|
Senior Member
Join Date: Sep 2012
Posts: 837
Thanks: 361
Thanked 674 Times in 264 Posts
|
Quote:
|
|
|
|
|
|
#9 | |
|
Junior Member
Join Date: Apr 2010
Posts: 16
Thanks: 0
Thanked 0 Times in 0 Posts
|
Quote:
If you scroll up to my photo of our dock years ago, following the methods of a father son winter dock service, that is all we had was a small round circle at the end of the dock. Thanks. With the recent 1-2 inches of snow, the shoreline along Lake Shore Drive is really risky. However, it is setting records for cold. Checked my dock today as the end posts were bent. I set the end aquatherm for a couple of hours to restore end protection. Checking the rest of the dock, at about the inside third point of my dock, a ridge area from what appears to be the constant current of the 24/7 looks to forming and building against the piles. This is what happened a couple of years ago. So the dilemma, turn on the inside aquatherm to protect my piles (and become part of the problem, risking contribution to the open waters) or let it be (as the risk to piles isn't even a consideration compared to the safety risk to others, and being exposed to that risk, of those who are openly and knowingly without regard)? Not willing to take that risk, won't turn it on. Will try to chainsaw some X's in the ice in that area to promote breakup at those piles. THANKS to many for information posted. I know much more than I did at the outset. It will be a while to get a chance for a rep to sponsor a bill, but at least I have some contacts and they understand that the lakes have changed in the 3-4 decades since the existing laws, and regulations, have been updated to address current issues. Hopefully there will be operating guidelines tied to the dock permits and ice retardant systems in the future that are enforceable and consequential. |
|
|
|
| Bookmarks |
| Thread Tools | |
| Display Modes | |
|
|