Go Back   Winnipesaukee Forum > Winnipesaukee Forums > Home, Cottage or Land Maintenance
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQ Members List Donate Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 08-19-2009, 03:09 PM   #7
EZ-Pass
Senior Member
 
EZ-Pass's Avatar
 
Join Date: Nov 2007
Posts: 66
Thanks: 6
Thanked 3 Times in 1 Post
Default

Quote:
Originally Posted by jmen24 View Post
Correct, or they get more than one price and cannot determine without a doubt that they are for the same scope, so as the project moves along the contractor continually says "well we did not include that in the original price".
A good contract will list every item used including types of wood, model numbers of the different appliances including towel racks to nail sizes, type of window, door casings. Nothing should be left undone. Home owner should have done all their homework and given the contractor all pertinent information regarding what they want so all contracts can price apples for apples.
It really is way to early for a contractor to give a accurate estimate two years before construction.
EZ-Pass is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 05:51 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.

This page was generated in 0.56996 seconds