![]() |
![]() |
|
|||||||
| Home | Forums | Gallery | Webcams | Blogs | YouTube Channel | Classifieds | Register | FAQ | Members List | Donate | Today's Posts | Search |
![]() |
|
|
Thread Tools | Display Modes |
|
|
|
|
#1 |
|
Senior Member
Join Date: Aug 2017
Posts: 741
Thanks: 155
Thanked 347 Times in 212 Posts
|
Curious what people have paid recently for a 6x40 crank up dock? It's a replacement - the pad and anchor for the crank is in place. I've got some calls in to different people and am wondering what, even ballpark, people are paying. Nothing is inexpensive these days!
|
|
|
|
|
|
#2 |
|
Senior Member
Join Date: Aug 2013
Location: Bedford, NH; Meredith, NH
Posts: 1,040
Thanks: 271
Thanked 860 Times in 355 Posts
|
Not exactly relevant, but we just had Watermark do a 9' extension to our crank up dock. 6' wide, azek decking, aluminum frame. That was $7500, including installation. Maybe multiply that by 4.5 to get you "in the ballpark"? (Side note: they charged us $13K for the 6 X 40 crank up dock new in 2013).
|
|
|
|
|
|
#3 | |
|
Senior Member
Join Date: Aug 2017
Posts: 741
Thanks: 155
Thanked 347 Times in 212 Posts
|
Quote:
|
|
|
|
|
|
|
#4 |
|
Senior Member
Join Date: Aug 2013
Location: Bedford, NH; Meredith, NH
Posts: 1,040
Thanks: 271
Thanked 860 Times in 355 Posts
|
Yes, the $13K included everything. Concrete pad at the shore that the dock frame is attached to; azek decking; 4X4 posts; winch pole and cabling; the sleeve in the ground that the winch pole sits in during the fall/winter; installation.
|
|
|
|
|
|
#5 | |
|
Senior Member
Join Date: Jan 2006
Posts: 244
Thanks: 1
Thanked 41 Times in 28 Posts
|
Quote:
|
|
|
|
|
| Sponsored Links |
|
|
|
|
#6 | |
|
Senior Member
Join Date: Feb 2008
Location: Gilford, NH / Welch Island
Posts: 6,604
Thanks: 2,477
Thanked 5,501 Times in 2,159 Posts
|
Quote:
My current decks at my place are a product called “Lumberock”. It is made of a solid blend of high density polyethylene (HDPE) and completely non organic. The color is either tan or cedar (don’t remember) and I have no heat issues with it. It is actually quite cooler than my previous PT deck. I absolutely love the product! Dan
__________________
It's Always Sunny On Welch Island!!
|
|
|
|
|
|
|
#7 |
|
Senior Member
Join Date: Aug 2013
Location: Bedford, NH; Meredith, NH
Posts: 1,040
Thanks: 271
Thanked 860 Times in 355 Posts
|
Our dock decking is a light gray azek. We purposely chose a light color to mitigate the heat retention, as it is in full sun all day (on a sunny day of course). I would say there are maybe a couple times per year that it gets really hot, to the point that you say "ow" when you first step on it. On those occasions, we just splash some water on it and problem solved. The maintenance-free, splinter-free qualities of the azek far outweigh the heat retention, in my view.
|
|
|
|
|
|
#8 |
|
Senior Member
Join Date: Jan 2006
Posts: 7,041
Thanks: 803
Thanked 1,525 Times in 1,056 Posts
|
We had the "old" Trex and it was awful on your feet. I hear it's better now though. We have Azek now and it's never been a problem.
|
|
|
|
|
|
#9 | |
|
Senior Member
Join Date: Feb 2005
Location: Gilford, NH and Florida
Posts: 3,234
Thanks: 779
Thanked 2,310 Times in 1,004 Posts
|
Quote:
It is two sections 6 X 27 bolted together to make a 12 X 27 dock. The sections were a little heavy to carry so a friend with a loader took them off the trailer at the street and brought them down to the water. I attached the posts and put the decking on myself. The aluminum work was excellent. My recollection is the cost of the aluminum was about $10,000. Lowes delivered the Trex to the house and the cost with the necessary fasteners was about $1,450. The dock is sitting on a breakwater so it will be permanent but could have been hinged. The bottoms of the posts are currently about 8 inches above the water so I am hoping the ice won't be a factor. |
|
|
|
|
|
|
#10 |
|
Senior Member
Join Date: Jul 2014
Posts: 6,694
Thanks: 1,187
Thanked 2,222 Times in 1,381 Posts
|
Dan (ishoot) and I have Lumberock on our different decks—his on his docks, as well—and it's totally fine on the feet in sun.
Sent from my SM-S931U using Tapatalk |
|
|
|
|
|
#11 |
|
Senior Member
Join Date: Jun 2021
Posts: 4,157
Thanks: 3
Thanked 701 Times in 580 Posts
|
All the tests we have seen.
It is a trade off. Material density, color, and engineered heat mitigation seems to be the main variables. |
|
|
|
|
|
#12 |
|
Senior Member
Join Date: Aug 2017
Posts: 741
Thanks: 155
Thanked 347 Times in 212 Posts
|
I have once price of $20,000 for a 6x50 crank up aluminum dock, installed and removal and disposal of the existing dock. Decking quoted is pressure treated. Second quote is higher; waiting on third.
Shocked how expensive things are! |
|
|
|
|
|
#13 |
|
Senior Member
Join Date: Nov 2016
Location: Waltham Ma./Meredith NH
Posts: 4,537
Thanks: 2,506
Thanked 1,296 Times in 833 Posts
|
That sounds reasonable, that's a big dock.
|
|
|
|
|
|
#14 |
|
Senior Member
Join Date: Mar 2003
Location: FL, Bear Is.
Posts: 196
Thanks: 52
Thanked 76 Times in 47 Posts
|
I have two recent quotes for a 6x40' aluminum crank-up, including pouring the foundation and using pressure treated decking. This is on an island.
about $25k and about $30k |
|
|
|
|
|
#15 |
|
Senior Member
|
Craigslist boats; someone in Laconia has a 6' x 24' aluminum truss frame for a hinge dock for sale for five hundred dollars. Has four good photos. Says made in year-2000.
Need to build a shoreline concrete base with hardware to fit the hinge on the frame.
__________________
.... Banned for life from local thrift store!
|
|
|
|
|
|
#16 |
|
Senior Member
Join Date: Aug 2017
Posts: 741
Thanks: 155
Thanked 347 Times in 212 Posts
|
|
|
|
|
|
|
#17 | |
|
Senior Member
Join Date: May 2006
Location: Texas, Lake Ray Hubbard and NH, Long Island Winnipesaukee
Posts: 2,995
Thanks: 1,067
Thanked 928 Times in 549 Posts
|
Quote:
Just for some comparison I took a look to see how expensive hardware from RDS is.... to do a pipe dock, 40' long you start with 1 4 leg kit ($927) and then 4 more 2 leg kits ($464 each), which gets you out to ~2.8K, which doesn't include the pipe for the legs so 12 legs at 60$ per (assuming all 8ft, so this cost is likely less, but this makes it easier) for 720, and lets say anoth $500 for cross bracing... so where are we now, at about 4K just for new hardware.... Now add in the needed wood, for the frames and and decking etc. and your likely looking at 7K to build your own dock....
__________________
Life is about how much time you can spend relaxing... I do it on an island that isn't really an island..... |
|
|
|
|
|
|
#18 |
|
Senior Member
Join Date: Jun 2021
Posts: 4,157
Thanks: 3
Thanked 701 Times in 580 Posts
|
Still in a very high demand cycle.
I keep track of license plates to let me know when we have a problem, and we still don't seem to be seeing less. |
|
|
|
![]() |
| Bookmarks |
|
|