View Single Post
Old 02-25-2022, 09:18 AM   #72
Lakegeezer
Senior Member
 
Join Date: Feb 2003
Location: Moultonboro, NH
Posts: 1,657
Blog Entries: 1
Thanks: 342
Thanked 618 Times in 278 Posts
Default Balance

Quote:
Originally Posted by John Mercier View Post
It isn't really funny.
There are many, such as myself, that want to see the lake properties increase in value and be built out... there are others that want to see that build out restrained.
There has to be a balance. A 2015 Moultonboro watershed study included a build-out report. Water quality metrics were measured for today, for a pre-development era and for build-out based on current regulations. It showed that, at the time there was 26% of land within the study area that could be built on. Build-out would occur between 2039 and 2058, depending on growth rates. A phosphorus level above 8 accelerates aging of the lake. We are already there in the Moultonboro Bay Inlet study area and would add to the aging acceleration if build-out happened. See graphic. Basin 1 is Greens Basin inner basin, Basin 2 is the basin including Evergreen Island and Basin 3 is from Lees Mills to roughly Buzzels Cove. TP is total phosphorus concentration.

Even in today's building craze, too many wavers are granted and many rules to control water runoff are ignored. Restraint is needed because the pressure to build satisfies an immediate need but the impact lags by decades. By the time cyanobacteria blooms keep us out of the water every August, it will be too late for easy corrections.
Attached Images
 
__________________
-lg
Lakegeezer is offline   Reply With Quote
The Following User Says Thank You to Lakegeezer For This Useful Post: