View Single Post
Old 05-18-2017, 10:49 AM   #46
Onshore
Senior Member
 
Join Date: Apr 2004
Posts: 500
Thanks: 12
Thanked 400 Times in 143 Posts
Default

Docking facility repairs, including breakwaters, that result in no change in the size, location, or configuration of the structures qualify as minimum impact projects. The filing fee for a minimum impact project is $200.
Onshore is offline   Reply With Quote