Thread: Surveyor
View Single Post
Old 02-06-2022, 10:46 AM   #15
TheProfessor
Senior Member
 
Join Date: Nov 2010
Posts: 1,062
Thanks: 17
Thanked 326 Times in 198 Posts
Default

Quote:
Originally Posted by codeman671 View Post
I have used one out of Gilford in the past and was not impressed. It was a small, quoted job and the final bill came back double.
Used one out of Gilford also. Was a disaster. Took 4 times promised time. Bill rose continually. If anyone puts a written contract in front of you. Read it.
Verbal promises mean nothing.
TheProfessor is offline   Reply With Quote
The Following User Says Thank You to TheProfessor For This Useful Post: