CC was on island today. The 25 pair cable was replaced from behind #54 to the entry point between #58 and #59. We now have hardwired DSL replacing the spliced temp fix. The old cable is still on the ground.
The cable on Descant's branch is still down as there is an ongoing septic install at #60.
Alan
|