View Single Post
Old 02-12-2013, 03:18 PM   #62
Rusty
Senior Member
 
Join Date: Oct 2010
Posts: 2,028
Thanks: 603
Thanked 687 Times in 425 Posts
Default

Quote:
Originally Posted by WINNOCTURN View Post
What you are talking about are the 2 side of a Breaker LINE and LOAD. Line (L1 & L2)is the Voltage from the Street, Single Phase 220V (Generator), Load is the side that the Breaker is sending to the equipment.

I use an Interlock on my panel and it works fine. You can power up the key circuits needed to "weather" the Storm. When laying out the breaker configuration you want to balance the "load" as evenly on L1 and L2. You can see this on the PANEL layout as to how the Furnace is on L1 and the Refrigerator is on L2. Out side of the Well Pump these are the most important Items to have working.
In the PANEL layout pdf file I see your furnace on L2 and your Refrigerator on L1.

Nice job with the PANEL layout on a pdf file, it explains L1 and L2 very well.
__________________
It's never crowded along the extra mile.
Rusty is offline   Reply With Quote