Quote:
Originally Posted by shore things
If you are constructing a new structure or expanding the footrint of an existing one within 250 ft of the lake you will need a shoreland impact permit from NH DES as well as any required local building permit.
You can find more information here:
http://des.nh.gov/organization/divis...cspa/index.htm
|
Shore Things, if the structure is less than 150 sq/ft do you still need to go through DES if it's 50' or more back from the lake?